Services
Eight services, one relocation manager
Most clients need three or four of these at once. They are priced and sequenced as one program, not stitched together from separate contractors.
- Perth metro and interstate
- After hours included
- AFRA member 0000 (sample)

What we actually do
Each service page carries what is included, how it runs, what drives the price and the questions clients ask before signing.

Office relocations
Whole-floor and whole-building moves planned around a Friday shutdown and a Monday start.
48 hrsTypical shutdown window
Open the service

IT and comms relocation
Rack decant, anti-static transport, re-rack, patch and a documented first boot.
1 RUManifest granularity
Open the service

Interstate office removals
Perth to every capital in sealed, manifested modules with a written transit window.
3,400 kmPerth to Melbourne
Open the service

Backloading and part loads
Shared linehaul space for staged consignments, satellite offices and single-room moves.
From 6 m³Minimum part load
Open the service

Packing, crates and unpacking
Crate hire, colour-coded labelling, shared-area packing and a day-one unpack crew.
2 cratesPer workstation, typical
Open the service

Furniture install and reconfiguration
Workstation dismantle and rebuild, desk-height resets, screen mounting and in-situ churn.
9 minPer desk, sit-stand rebuild
Open the service

Specialist and high-value items
Safes, switchboards, laboratory and imaging equipment, artwork, pianos and reception pieces.
1.2 tStandard gantry capacity
Open the service

Storage and document archiving
Fitout-gap storage in sealed modules, plus barcoded archive cartons with chain of custody.
7 m³Per storage module
Open the service
Thursday 4:00 pm to Monday 7:30 am
The whole program, recapped. This is the shape of a standard single-floor relocation; multi-floor work stages the same six beats across more nights.
Thu 4:00 pm
Floors packed, crates labelled
Staff have packed their own workpoints. Shared areas, kitchens and compactus are packed by our crew. Every crate carries a floor colour and a workpoint number.
Fri 5:00 pm
Shutdown, comms room first
Last backup confirmed by your IT team. Devices powered down in order, racks audited, cables labelled at both ends and decanted into anti-static crates.
Fri 8:00 pm
Dock open, workstations down
After-hours dock slot opens. Workstations are dismantled, parts bagged to component, tops stillaged and chairs skated. Loading runs to the runsheet, floor by floor.
Sat 7:00 am
Racks landed, furniture built
Racks re-racked and patched to the new schedule. Workstations built to the numbered destination plan, desk heights reset, monitor arms refitted, cable trays re-run.
Sun 10:00 am
First boot and floor walk
Your IT team powers on and tests while our crew are still on site. Crates are positioned at numbered workpoints. The relocation manager walks every floor against the manifest.
Mon 7:30 am
Monday-ready, crew on site
A small crew stays through the first morning for adjustments: desk heights, screen positions, a chair swap, a crate in the wrong bay. Crate collection is booked for the Friday.