Enquiry
Plan your relocation
Four questions. Then a call, a survey and a written proposal with the storage rate quoted from day one, so a fitout delay never becomes a variation.
- Free site survey, Perth metro
- Proposal in 3 business days
- No obligation
What happens after you press send
- A call within one business dayTen minutes to confirm scope, dates, buildings and any constraint you already know about.
- A free site survey of both tenanciesWe measure dock height, goods lift internals, door widths, floor loading and the comms room, and photograph all of it.
- An itemised project priceCrew hours, vehicles, crates per week, storage per module per week and cover options, each on its own line.
- A draft runsheetTimes, crew numbers, vehicle allocations and contacts, issued before you are asked to commit to a date.
Thursday 4:00 pm to Monday 7:30 am
The whole program, recapped. This is the shape of a standard single-floor relocation; multi-floor work stages the same six beats across more nights.
Thu 4:00 pm
Floors packed, crates labelled
Staff have packed their own workpoints. Shared areas, kitchens and compactus are packed by our crew. Every crate carries a floor colour and a workpoint number.
Fri 5:00 pm
Shutdown, comms room first
Last backup confirmed by your IT team. Devices powered down in order, racks audited, cables labelled at both ends and decanted into anti-static crates.
Fri 8:00 pm
Dock open, workstations down
After-hours dock slot opens. Workstations are dismantled, parts bagged to component, tops stillaged and chairs skated. Loading runs to the runsheet, floor by floor.
Sat 7:00 am
Racks landed, furniture built
Racks re-racked and patched to the new schedule. Workstations built to the numbered destination plan, desk heights reset, monitor arms refitted, cable trays re-run.
Sun 10:00 am
First boot and floor walk
Your IT team powers on and tests while our crew are still on site. Crates are positioned at numbered workpoints. The relocation manager walks every floor against the manifest.
Mon 7:30 am
Monday-ready, crew on site
A small crew stays through the first morning for adjustments: desk heights, screen positions, a chair swap, a crate in the wrong bay. Crate collection is booked for the Friday.