Reviews
What facilities managers say afterwards
The people who write these are the ones who had to explain the plan to an executive team. They tend to be specific.
- 4.9 average
- 186 sample reviews
- Perth metro and interstate
4.9
186 sample reviews
Sectors represented
- Mining and resources
- Healthcare
- Engineering
- Education
- Legal
- Professional services
- Marine services
- Not-for-profit
- State government
Average of 186 sample client reviews collected across Perth metro projects. Ratings on this demo site are illustrative.
Featured review
Two floors, 214 desks, and a dock window of three hours a night. They planned around it instead of arguing with it. Nobody lost a work day.
Every review
284 record cartons, every one scanned in front of me before it left the file room. The reconciliation came back clean on Sunday afternoon.
Meera KrishnanPractice Manager · Subiaco
Storage and archiving
The 2.1 metre basement was in their quote before it was in our heads. That is the difference between a site visit and a phone estimate.
Tomas ReidyOperations Lead · West Perth
Office relocations
We started with a basement of unlabelled boxes and finished with a live inventory and destruction dates. Worth more than the move itself.
Wendy AplinBusiness Manager · Joondalup
Storage and archiving
Seal numbers recorded at both ends and checked before anything was opened. They led with that. Everyone else led with price.
Alastair NguyenOffice Manager · Perth CBD
Interstate office removals
Callum sent a readiness report that told us our new comms room had no condensate drain. Unwelcome on a Tuesday, priceless by Saturday.
Bianca OkaforHead of Technology · West Perth
IT and comms relocation
West End heritage building, no lift, 900 mm landing. The boardroom table came apart and went back together properly. Slower than quoted by an hour.
Hamish TrenowethGeneral Manager · Fremantle
Specialist and high-value items
Colour by floor, number by workpoint. Our staff found their own crates without asking anyone. I have never seen a move that quiet.
Ngaire WhitcombeOffice Coordinator · Osborne Park
Packing and crates
Eleven weeks of fitout delay and not one variation, because the storage rate was quoted from day one. That is rarer than it should be.
Rajiv BalakrishnanFinance Director · Perth CBD
Storage and archiving
A whole department reconfigured over two nights between semesters. Desk heights set, screens mounted, defect list cleared by Wednesday.
Elke SandbergCampus Services · Joondalup
Furniture and reconfiguration
Racks travelled upright, devices in anti-static crates, manifest signed at both ends. One patch panel label mismatch, logged and photographed rather than fudged.
Patrick IhakaIT Manager · Perth CBD
IT and comms relocation
A small satellite office going east, 14 cubic metres, own sealed module. Cost a fraction of the dedicated quote and arrived inside the window.
Susannah DelaporteManaging Partner · Subiaco
Backloading and part loads